Respuesta :
Given that total amount of metal in the beginning = 8.2 square feet
Given that used amount of metal = 2.1 square feet
Then remaining amount of metal = (8.2-2.1) = 6.1 square feet
Now it says that "$183 worth of sheet metal remaining".
That means cost of 6.1 square feet is $183.
Let cost of 1 square feet of the metal = x
Then cost of 6.1 square feet of the metal = 6.1x
Both expressions 6.1x and $183 represent the cost of the remaining metal so the required equation will be:
6.1x=183
Now we can solve it to find the solution
x=183/6.1
x=30
So the cost per square feet of the metal = $30
Hence final answer is $30 per square feet.
The cost of the sheet metal per square foot is $30.
The first step is to determine the square feet that the contractor used. This can be determined by subtracting the square feet of sheet she bought from the sheet metal she has used so far.
Sheet metal used = 8.2 - 2.1 = 6.1 square feet.
This means that 6.1 square feet costs $183.
The second step is to determine the cost of one square feet of sheet metal. This can be determined by dividing $183 by 6.1
$183 / 6.1 = $30
A similar question was answered here: https://brainly.com/question/19919624?referrer=searchResults