TordtheMan5502 TordtheMan5502
  • 30-04-2024
  • Business
contestada

Seven jobs are available to be produced on a single machine. The jobs have processing times (2, 1, 5, 3, 9, 13, 24) and due dates (12, 34, 8, 42, 65, 51, 29), respectively. Find the schedule that minimizes average flow time. What is the minimized average flow time?

Respuesta :

Otras preguntas

why did delegates during the convention conduct all meetings in secret
You need 1 1/4 cups of sugar to make 20 cookies to make 16 cookies you will need
Which units measure the amplitude of sound waves
Which of these is the term for an alliance of independent states that has a very weak central or national government and gives the supreme authority to the stat
A line contains the points (82, −96) and (87, −86). what is the slope of the line in simplified form?
if the poem has internal rhyme, it must have a rhyme scheme. true false
How do prokaryotes and eukaryotes differ and how are they alike?
write equation in standard form for a line passing through (1,6) with a slope of 2
Explain each step (10×n)×7
To make 1 1/2 dozen muffins, a recipe uses 1 cup of sugar. How many cups of sugar are needed for every dozen muffins made?
ACCESS MORE