Which one is a positive risk?
1) Saving cost of project
2) Implementation of new technology that leads to a reduction in the cost of engineering
3) Loss of reputation
4) Cost overrun in project
5) Inflation in Time Material contract
6) Improve performance

Respuesta :

Otras preguntas

Difference between hofstede and trompenaars
The ratio of the boys to girls in the cafeteria is 3:4. if there are 40 more girls than boys, how many girls are in the cafeteria?
What situation was direct challenge to the political and religious authority of the Catholic church
What happens to people who are without friendship
What is the shortest phase of the cell cycle
Ongoing wave action in the intertidal zone creates which environmental condition that allows for more organisms to survive there? Abundant oxygen Abundant su
What were some of the immediate consequences of the printing press?
\Which of the following statements about reflected images is true? Reflected images can vary in many ways from the actual object. Reflected images always l
6x+2y=24 in function form
Tornado are most frequent from
ACCESS MORE