abigailguzman672 abigailguzman672
  • 20-03-2024
  • Computers and Technology
contestada

Non-value add can be described as activities which:
A. Are not involved with meeting customer requirements, but are required
B. Should be excluded from your value stream maps
C. Should be out of scope

Respuesta :

Otras preguntas

What do chains of amino acids build?
Can anyone solve this for me :))?
he Wet Corp. has an investment project that will reduce expenses by $25,000 per year for 3 years. The project's cost is $15,000. If the asset is part of the 3-y
0.4x=1 ANSWER ASAP GIVING BRAINLIEST
Can you please help me I will give you extra points and the brain thing? image below
Suppose that the battery has a total current in a series connection of 12.0 Ω and the lamps resistances R₁, R₂ and R₃ are 6.0 Ω, 4.0 Ω and 2.0 Ω, respectively.
What can be concluded about the graphed polygon?On a coordinate plane, side a has points (negative 2, 4) and (5, 4), side b has points (5, 4) and (5, negative 3
In the figure, <6 and <3 are
He looked completely blank when she asked him to go to the movies A. Bewildered. B.inflammable. C.hostile
Write an equation in slope-intercept form for the line described. Slope 4, y-intercept (0,-7)
ACCESS MORE