A soda bottling company's manufacturing process is calibrated so that 2% of bottles are not filled within specification. Every hour, 12 random bottles are taken from the assembly line and tested. If 3 or more bottles in the sample are not within specification, the assembly line is shut down for re-calibration.
What is the probability that the assembly line will be shut down for re-calibration?