kjwieers9960 kjwieers9960
  • 30-01-2024
  • Mathematics
contestada

If x men take y days to complete a job, then what is the number of men required to complete the job in z days?
a) xy/z
b) xz/y
c) yz/x
d) x/yz

Respuesta :

Otras preguntas

Hi. Could I get help with the below problem. TIA Find the value that completes each proportion. 4/5 = ?/15
Describe the next figure in each pattern. Then draw the figure
How do you convert 8.5 to a fraction explain how you do this please thank you.
A rectangular area of land is being sold off in smaller pieces. The total area of the land is 2^15 square miles. The pieces being sold are 8^3 square miles in s
what appliances use electromagnets
how many factors does 25 have
the teacher separated her class of twenty-eight student into two group. one group has 4 more than twice as many students as the other group. how many students
A bulldozer is rented at $800 per day plus a charge per hour of use. The bulldozer was used for 5 hours on a day, and the total charge was $3000. Which equation
term used for the action of the ball as it bounces off the backboard or rim.
How do you use compatible numbers to estimate the quotient $595 divided by 25
ACCESS MORE