Three different activity times are needed for probabilistic time estimation. Match the term with the definition.
A) Pessimistic time
B) Most likely time
C) Optimistic time
D) Expected time

Respuesta :

Otras preguntas

Cala stacked some blocks to make the figure below . How many blocks ore in Cala's figure
Find the rate and unit rate for 40 meters in 16 seconds
Cala stacked some blocks to make the figure below . How many blocks ore in Cala's figure
How to write 3.17 In word form?
which of the following statements about sexual attaration and intimacy in the work place is true?1.romance between a worker and a supervisor must allways be out
How to rename the number 24 ten thousands?
Find slope and y-intercept.a) y=3x=12            b)  x=7
What is foreshadowing
two data sets have the same mean. can you assume that the ranges of the two data sets are about the same? give an example to justify your answer.
7,000 is 10 times as much as
ACCESS MORE