4. Three conveyor belts are arranged to transport material and the conveyor belts must be started in reverse sequence (the last one first and the first one last) so that the material does not get piled on to a stopped or slow-moving conveyor. Each belt takes 45 seconds to reach full speed. Design a ladder logic that would control the start and stop of this three-conveyor system