A Set Of 6 Jobs Is To Be Processed Through Two Work Centers. All The Jobs Have To Be Processed At Work Center 1 And Then Work Center 2 In The Same Sequence. Processing Time (In Hours) At Each Of The Work Centers Is Shown In The Following Table. Job A B C D E F Work Center 1 16 30 10 24 10 5 Work Center 2 12 19 14 17 7 18 A) If The Job Sequence, A-B-C-D-E-F,IS USED what is the makespan ?