a. which 105/8 questions project method would you use for non-repetitive projects where activity times are not known with certainty? b. If the ordering cost of a product is reduced to one-fourth, what will be the impact on the EOQ? c. If the severity, occurrence and detectability scores of a particular failure mode are 3, 7 and 4 respectively, what is the RPN of this failure mode? d. Creating a project charter is part of which stage in the six sigma project? e. For JIT to be practically implementable, what should be the nature of demand? f. If the standard deviation of the project duration is 4 weeks, and mean time to complete the project is expected to be 40 weeks, what is the probability that the project would be completed in 32 weeks? g. If the confidence level required to fulfil the demand increases from 90% to 95%, what would be the % increase in the safety stock? h. Which scheduling rule is expected to give lower work in process? i. Which scheduling rule is expected to give lowest average lateness of jobs? j. Which are the two most prominent departments involved in S&OP meetings in an organization? k. Mention any two inputs for generation of MRP 1. Among the 8 wastes of lean, which is the 8th waste that has been recently added to the origial 7 wastes?