(2, LO1) In a job-order costing system, which costs are accumulated in the work in process account for each job? Select one: O a. Direct materials, direct labor, actual manufacturing overhead O b. Direct labor, actual manufacturing overhead, indirect materials O c. Applied manufacturing overhead, direct labor, direct materials O d. Indirect materials, indirect labor, applied manufacturing overhead o e none of these is correct.