A quality com technician has been montong the output of a ming machine Each on the chec 20 perts to measure and plot on the control chart Over 10 days, the average damater wiss 1213 meses w of 00375 meters What is the lower control in CL for an X-bar chant of this st Note: Round your answer to 4 decimal pieces