matysteven8587 matysteven8587 27-05-2023 Business contestada An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 10:40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rating of 125 pe