Current Attempt in Progress Consider an X control chart with F = 0.357, UCL = 14.684, LCL = 14.309, and n = 5. Suppose that the mean shifts to 14.6. (a) What is the probability that this shift will be detected on the next sample? Probability - i [Round your answer to 4 decimal places (e.g. 98.7654).] (b) What is the ARL after the shift? ARL = [Round your answer to 1 decimal place (e.g. 98.7).)