bebe4552 bebe4552
  • 20-05-2023
  • Business
contestada

suppose a project has an irr equal to the cost of capital. what can you say about the project's npv?npv will be positivenpv will be exactly zeronpv will be negativenot enough information to say anything about npv

Respuesta :

Otras preguntas

what is E=m² the famous theory of albert einstien?
what is a rational number between -1/6 and -2/6
Peter jogged 96 yards in 40 seconds? What is his speed in feet per second?
Peter jogged 96 yards in 40 seconds? What is his speed in feet per second?
what is a rational number between -1/6 and -2/6
what is E=m² the famous theory of albert einstien?
I am a number between 500 and 600. My Ones digit is 5. My tens digit is the difference between my ones and hundreds digits. Who am i
Peter jogged 96 yards in 40 seconds? What is his speed in feet per second?
2 m3 of soil containing 35% sand was mixed into 6 m3 of soil containing 15% sand. what is the sand content of the mixture?
I am a number between 500 and 600. My Ones digit is 5. My tens digit is the difference between my ones and hundreds digits. Who am i
ACCESS MORE