When using the critical ratio (CR) to develop a sequence,
A. a CR of 1.0 means that the job must be scheduled first. B. a CR of 1.0 means that the job must be scheduled last. c. a CR greater than 1.0 means that the job has some slack. D. a CR less than 1.0 means that the job is ahead of schedule