typical causes of the fixed overhead spending (budget) variance include . multiple select question. differences between actual production volume and the volume level assumed when the fixed overhead rate was determined excessive spending on fixed overhead items dues to inadequate monitoring (cost controls) changes in operational efficiencies (that is, productivity changes) failure to anticipate or incorporate changes in spending for fixed overhead